EC-Z659
13/24

Electrical parts outage and design changesIf the electronic parts will be discontinued, we will receive an advance notice from the parts manufacturer. As soon as the notice is received, the Design Dept. will calculate the time required for designing change. The Production Control Dept. will calculate the volume of shipping within the designing period and order the necessary quantity to the parts manufac-turer.If it involves circuit changes, we will need to redo many processes including evaluation test. However, M-System has its own test facilities such as the anechoic chamber and the shielded room certified and registered by the official body to perform the change tasks efficiently at any time. If we cannot avoid supply outage of electronic parts, we will cover it by the designing speed.Production Control Dept.Design Dept.Quality Assurance Dept.Notice of product discontinuation from the parts manufacturersTechnology reviewChange design drawingsReview by the design review meeting* Please allows us further two months to modify the entire printed board.Review the technology review resultEvaluation testRegister to the production master server3 weeks*7 weeks*M-Unit 33 Years AgoCurrent M-UNITCompact Plug-in Mini-M SeriesLow Profile M5 SeriesUltra-slim M6 SeriesHead-mounted Two-wire Signal Conditioners 27 SeriesPico-M Series13

元のページ 

10秒後に元のページに移動します

※このページを正しく表示するにはFlashPlayer10.2以上が必要です